Step 1
The glass surface need is polished and cleaned to ensure that the surface is clean, flat and dry.
Step 2
Thin brush 2-3 times, every time interval 2-3 hours, the smooth surface of the glass should be brushed several times for better effect.
And the tools should be cleaned in time during the brushing interval to prevent dry and hard.
Step 3.
Avoid getting wet for 24 hours after brushing, and the paint film will be completely dry after 7 days. Do not bump or scratch it during this period.
Step 4.
Construction is complete